Equipment
The following equipment will be available to the personnel assembling the calorimeter submodules:
A
Timesaver machine
A
stacking fixture
A
glue application
machine
A
welding fixture
A
surface coating
applicator
A 25-ton track-mounted overhead crane
The assembly area
Floor plan of the construction area
Photos of the Equipment
the gluing machine
the crane
the Timesaver machine
stacking fixture
Return to the Main Sub-Module Construction Page
Last Modified: 12/01/98
A.J. Tolland (
[email protected]
)