Proposed Agenda for 3-in-1 Design Review
Date: Thursday, December 3, 1998
Time: 9:00 AM to 4:00 PM
Place: BNL Instrumentation Division, Bldg. 535, Conference Room.
Timing: each talk ~20 minutes + questions and discussion
Reviewers:
Vinnie Polychronakos (BNL) (chair)
[email protected]
Paul O'Connor (BNL)
[email protected]
John Parsons (Columbia)
[email protected]
Larry Premisler (BNL)
[email protected]
Sergio Rescia (BNL)
[email protected]
1. Introduction - Jim Pilcher (Chicago)
-
requirements (functionality, performance, environment)
-
organization
-
logical configuration of hardware
-
institutions and responsibilities
-
test beam milestones passed
-
related systems and their reviews
-
timetable
-
production goals
-
pre-production prototypes
-
production readiness review (PRR)
-
expectations from this design review
2. System and Interface Issues - Jim Pilcher (Chicago)
-
cooling
-
low voltage
-
LVL1 trigger
-
digitizer
-
grounding
3. 3-in-1 Design Overview and Methodology - Harold Sanders (Chicago)
-
motivation for architecture choice
-
shaper
-
calibration
-
digital control
-
design tools
4. Design Details - Fukun Tang (Chicago)
-
detailed design (shaper, control, calibration)
-
simulation
-
layout, routing
5. Slow Integrator - Georges Blanchot (IFAE, Barcelona)
-
design requirements
-
design details
-
performance demonstration
6. Mother Board system - Kelby Anderson (Chicago)
-
overview
-
design
-
systems in use
-
planned evolution
7. Prototype Testing - Kelby Anderson (Chicago)
-
'98 beam tests
-
radiation tests
8. Conclusions - Jim Pilcher (Chicago)
-
tasks remaining
-
Production Readiness Review