From: SMTP%"BYON@FNALD.FNAL.GOV" 21-JUL-1998 23:12:46.26 To: FRISCH CC: Subj: Electronics schedule & cosmic data taking Resent-Date: Tue, 21 Jul 1998 23:12:44 -0500 (CDT) Resent-From: frisch@uchepa.uchicago.edu Resent-To: frisch@uccdf.uchicago.edu Date: Tue, 21 Jul 1998 23:11:57 -0500 (CDT) From: BYON@FNALD.FNAL.GOV To: "FNALD::DERVIN"@FNALD.FNAL.GOV, "FNALD::AMENDOLIA"@FNALD.FNAL.GOV, "FNALD::DAN"@FNALD.FNAL.GOV, "FNALD::APOLLINARI"@FNALD.FNAL.GOV, "FNALD::BAOJZ"@FNALD.FNAL.GOV, "FNALD::BAUERG"@FNALD.FNAL.GOV X-Vmsmail-To: @DAQ Message-Id: <980721231157.2165d375@FNALD.FNAL.GOV> Subject: Electronics schedule & cosmic data taking as of July 2, 1998 Current Detector Schedules ========================== Plug Calorimeter ready Jan 25 '99 Central Calorimeter ready Mar 15 '99 CMU ready Apr 16 '99 CMP/CSP ready Aug 9 '99 COT at B0 Jun 23 '99 COT ready Aug 12 '99 * note 1: "ready" means detector all buttoned up, HV, LV, gas, electrical all hooked up, cables all dressed, and related VME crates for readout modules all installed - can read it out as long as electronics are installed in the crates. * note 2: "COT at B0" means COT detector assembly, including the installation of ASD on the camber face is completed and checked out at IB4 and moved from IB4 to B0 assembly hall. * note 3: Cosmic data taking with Calorimeter and Muon system can start from Apr '98 * note 4: If solenoid is ready to be turned on, Cosmic data taking with COT, Muon, and Calorimeter system can start from Sep '98 Electronics Installation schedules ================================== Clock production 9/ 1/98 - 1/15/99 installation & checkout 11/ 9/98 - 2/26/99 commissioning 3/ 1/99 - 5/ 7/99 TS production 7/22/98 - 1/19/99 installation & checkout 10/23/98 - 3/25/99 commissioning 12/ 4/99 - 7/29/99 Calorimeter ----------- Calorimeter ADC production 9/16/98 - 8/31/99 installation & checkout 12/ 9/98 - 10/12/99 commissioning 3/ 3/99 - 12/ 7/99 Lv1 Cal Trg production 9/16/98 - 7/20/99 installation & checkout 1/20/98 - 9/28/99 commissioning 4/14/99 - 12/21/99 Lv2 Cal Trg production 8/21/98 - 5/27/99 installation & checkout 1/22/98 - 8/19/99 commissioning 5/14/99 - 12/ 9/99 Shower Max elec production 9/10/98 - 1/12/00 installation & checkout 2/11/99 - 2/23/00 commissioning 6/17/99 - 3/22/00 Tracking (muon+COT) ------------------- TDC production 8/12/98 - 10/ 5/99 installation & checkout 12/16/98 - 11/30/99 commissioning 1/27/99 - 1/11/00 Muon Trg production 7/ 1/98 - 6/15/99 installation & checkout 2/ 3/99 - 8/17/99 commissioning 4/14/99 - 11/23/99 XFT production 10/28/98 - 4/13/99 installation & checkout 4/14/99 - 8/31/99 commissioning 9/ 1/99 - 1/18/00 XTRP production 11/25/98 - 6/22/99 installation & checkout 6/23/98 - 9/28/99 commissioning 9/29/99 - 2/ 1/00 Decision Crates --------------- Lv1 Decision production 11/25/98 - 2/ 9/99 installation & checkout 2/10/99 - 6/ 1/99 commissioning 3/24/99 - 11/ 2/99 Lv2 Decision production 11/25/98 - 2/ 9/99 installation & checkout 2/10/99 - 6/ 1/99 commissioning 3/24/99 - 11/ 2/99 ** note: Graphic version of these schedules can be found in FNALD::CDF$ROOT4:[UPGRADE.PRODUCTION.ELECTRONICS]ELECTRONICS_COSMIC_SCHEDULE.PS